Projects
Project Name Project Owner Location
Amount
Date Started
Date Completed
Status
Construction of Classroom Building Ligas & Queensrow Elementary School DPWH Cavite, Engineering District-Owner Trece Martirez, Cavite Philippines 0.52M 11-May-93 01-June-93 Completed
Replacement of 1 Standard Classroom Building P.F. Espiritu Elementary School DPWH Cavite, Engineering District Trece Martirez, Cavite Philippines 0.36M 20-July-93 30-June-93 Completed
Construction of Classroom Building Ligas & Queensrow Elementary School DPWH Cavite, Engineering District-Owner Trece Martirez, Cavite Philippines 0.52M 11-May-93 01-June-93 Completed
Replacement of 1 Standard Classroom Building P.F. Espiritu Elementary School DPWH Cavite, Engineering District Trece Martirez, Cavite Philippines 0.36M 20-July-93 30-June-93 Completed
Concreting of Diamante Street DPWH NCR Manila South Engineering District San Andres Manila, Philippines 1.00M 20-July-93 13-Oct-93 Completed
Fabrication and Delivery of Steel Railings Philippine Overseas Employment Administration POEA Building, Ortigas Avenue cor. EDSA Mandaluyong City, Philippines 0.25M 23-Jun-93 21-Jul-93 Completed
Prov. of New Overhead Water Pipelines Philippine Overseas Employment Administration POEA Building, Ortigas Avenue cor. EDSA Mandaluyong City, Philippines 0.20M 21-Jul-93 17-Aug-93 Completed
Two Storey Residence Building Mr. and Mrs. Al Rashid Cayngcat-Owner St. Francis Homes, Canlalay Biñan, Laguna, Philippines 1.15M 10-Mar-94 10-Jun-94 Completed
Site Development/Low Cost Housing   Balaybay Resettlement Project
Balaybay, Zambales, Philippines
101.00M 15-Oct-94 15-Dec-95 Completed
Site Development/Low Cost Housing Mawaque Resettement Project Mawaque, Mabalacat Pampanga, Philippines 120.00M 10-Feb-94 30-Aug-94 Completed
Site Development/Low Cost Housing/Classroom Madapdap Resettlement Project Mabalacat Pampanga, Philippines 205.00M 30-Jun-95 30-Oct-96 Completed
65 Units Bunkhouse Cabcom Resettlement   Clark Airbase, Mabalacat, Pampanga Philippines 28.50M 31-Jul-95 15-May-96 Completed
Repair/Rehabilitation and Extension of Ports South Harbor Piers 3,5,9, and 15 Philippines   15-Jun-94 27-Feb-95 Completed
Dumping Platform Project Carmona Sanitary Landfill Carmona, Cavite, Philippines 2.80M 20-Apr-96 10-Jun-96 Completed
Digitel NX-2 Project Civil Works, Pipe Laying, Manhole Installation
Alaminos, Binmaley, Bolinao, Bugallon, and Mangatarem Pangasinan, Philippines
30.00M 10-Oct-96 30-Jan-97 Completed
FVR Kabuhayan Factory Livelihood Project Phase 1 Mabalacat, Pampanga, Philippines 150.00M 10-Oct-96 25-Jan-97 Completed
Toyota Motors Corporation Philippines a. Dealers Office / b. Security Guard House, Riprap Fence, Main entrance, Press Foundation, Die Making Plant, etc. Sta. Rosa, laguna, Philippines 60.00M 06-Jun-96 30-Sept-97 Completed
Digitel NX-2 Priority 1 and 2 Project (40 sites) Civil, Electrical and Mechanical Works Fire Alarm and Security System Region 4 and 5 210.00M 09-Sept-96 07-Apr-99 Completed
DPWH Palawan Project Road Construction Concreting Philippines 3.80M 10-Oct-96 28-Feb-97 Completed
Yakult Philippines Yakult Expansion Plant Bo. Makiling, Calamba
Laguna, Philippines
20.00M 20-Jan-97 31-Mar-98 Completed
38 and 39 Storey KSA Tower Manpower Supply Ayala Avenue, Makati City Philippines 10.00M 14-May-97 07-Dec-98 Completed
Philippine National Construction Corporation Q.I. Warehouse E. Rodriguez, Quezon City 5.00M 07-Oct-97 07-Oct-98 Completed
Completed Projects
 

Digitel
Location 1
Location 2

Smart
Location 1
Location 2

Globe
Location 1
Location 2

Engr. Aristeo Jabola
Sr. Technical Manager


Qualifications

  • Bachelor of Science in Civil Engineering, Mapua Institute of Technology, Manila, Philippines
  • Graduate, Management Development Program, Asian Institute of Management, Makati City, Philippines, 1996
  • Master’s Certificate in Project Management, George Washington University, Washington DC, USA, 1997
  • Posted as Construction Department Manager.
 

Primarily responsible for all the activities related to procurement, construction and commissioning of major geothermal steam field development projects as wells as refurbishment works required for efficient operation of existing plants.

Fields of Special Competence
In engineering, procurement & construction management -development planning and civil works design with 33 years experience on engineering design, procurement and construction, of which over 20 years is related to geothermal steam field development.

110 MW Bacon Manito I Geothermal Project (1993)
40 MW Bacon Manito II Geothermal Project (1994)
80 MW Palinpinon II Geothermal Project (1993)
52 MW Mindanao Geothermal Project (1996)
200 MW Leyte-Cebu Geothermal Project (1996)
400 MW Leyte-Luzon Geothermal Project (1998)

BacMan Geothermal Production Field (BGPF)

Location : Covers the boundary of Legaspi City, Sorsogon City, Bacon District of Sorsogon City and the town of Manito Albay in the Bicol Region, South of Luzon.

The Bacon-Manito field at the boundaries of Albay and Sorsogon provinces has perhaps the longest gestation period, having been caught by the national financial crisis in the 1980’s. Time was when only one PNOC rig was in operations in Bacman but finally the field went out stream in 1993-1994 with Palayan Units 1 and 2 of 55 MW each. This station is called Bacman I with combined capacity of 110 MW.

Simultaneously, Bacman II was developed. In 1994, Unit 3 with 20 MW was commissioned at the Cawayan sector. By 1998, two more units are committed for operations, namely Unit 4 at Botong with 20 MW and Unit 5, an Ormat Binary System, with 12 MW. These are PNOC EDC’ initial contributions to Luzon grid.

( Click Here for more Info - Energy Development Corporation Website)

Mindanao Geothermal Production Field (MGPF)

Location
: Within the borders of Barangay Ilomavis, Kidapawan City in the province of North Cotabato

The fourth field developed by PNOC-EDC is located of the North Cotabato side of Mt. Apo and is simply called Mindanao I. It has the smallest geothermal reservation, 710 hectares of kaingin and primary forest, set aside by the Presidential Proclamation after intense public debates resulting in the delayed issuance of an ECC on 1992.

Because of stringer ECC requirements such as the zero waste disposal system, it took PNOC EDC four years to commission Unit 1 with 52 MW in December 1996.

The power plant was constructed and is being operated under the BOT system by the Oxbow-Marubeni consortium. At present, power services goes to the capital town of Kidapawan through a special transmission line constructed for that purpose. Later, another line will connect Mindanao I to the power grid.

A second unit of 48 MW has been awarded, again to an Oxbow-Marubeni consortium, still under BOT scheme. Phase 2 is expected to be operational by May 1999. The operation of this unit will raise Philippine geothermal capacity to a new high of 1,900 MW by 1998.

( Click Here for more Info - Energy Development Corporation Website)

Southern Negros Geothermal Production Field (SNGPF)

Location : 21 kilometers northeast of Dumagete City in the municipality of Valencia, Negros Oriental

Simultaneous with developments in Leyte, the Palinpinon field in Southern Negros was also drilled and developed starting 1978, resulting in the commissioning of 112.5 MW of generating capacity in mid 1983, serving initially the power requirements of Negros Oriental.

This field is a prime example of compact development where virtually everything is located within a 60 hectare area. Productions well are a few meters apart from one another at the surface but each one is directional, directed at different targets underground. The production pipelines are similarly laid out together toward the separator stations and later down to Units 1 to 3 of the Palinpinon-I power plant.

With a new and more reliable transmission line, Palinpinon power was extended to Negros Occidental several years later.
A submarine cable was laid out toward Panay Island via Guimaras to bring more reliable geothermal power to additional four provinces of Western Visayas. The increase in power demand was met with the commissioning of 40 MW from Units 4 and 5 (Palinpinon II) in 1994.

Subsequently, another submarine cable was laid out by NPC to connect Negros Island with Cebu Island. The additional power demand was similarly serve by Units 6 and 7 (Palinpinon II) with another 40 MW starting 1995.

( Click Here for more Info - Energy Development Corporation Website)

Completed Projects
 

Aduco International B.V.
Sudan, Africa

Dai Nippon Construction
Afghanistan
Besioport, Kiribati
Bhuttan
Chimoio, Mozambique
Cuamba, Mozambique
Funafuti, Tuvalu
Kiribati
Malawi, Africa
Phase 1 -Dili, East Timor
Phase 2 -Dili, East Timor
Quelimane, Mozambique
Vanuatu
Xai-Xai, Mozambique

Fukui Construction Co., Ltd.
Aduco, Tanzania
Japan
Nigeria, Africa
Sri Lanka

Kajima Corporation
Sakhalin, Russia
Taiwan
Zambia

Kajima Dubai
Dubai, U.A.E.

Kajima Shimizu Joint Venture
Ghana, Africa

Kajima Taisei Obayashi Maeda Joint Venture
Vietnam


Kitano Construction
Solomon Island

Konoike Corporation
Burkina Faso, Africa
Malawi, Africa
Mongolia

General People's Committee of Health & Social Security
Benghazi, Libya

Hitachi Plant Engineering & Construction Co. Ltd
Nigeria, Africa
Egypt
Nassau, Bahamas

Ishikawajima Harima Heavy Industry Corporation
Sanaa, Yemen

Japan Gas Corporation
Kingdom of Saudi Arabia

JGC Nigeria Ltd.
Nigeria, Africa

Mitsui Construction Co. Ltd.
Djibouti, Africa

Nippon Express (Singapore) Pte. Ltd
Singapore

Ohki Corporation
Vietnam

Penta Ocean Construction Co., Ltd.
Koror, Palau

Taisei Corporation
Oran, Algeria
Doha, Qatar
Dubai, U.A.E.
Iraq

Nairobi, Kenya
Nigeria, Africa
Oman
Peru
Vietnam
Zambia, Africa

Taisei Rotec Joint Venture
Vietnam

Tobishima Corporation
Brunei Darussalam

Tripoli Medical Center
Tripoli, Libya

WP Lorong (Wee Pooh) Construction)
Dili, East Timor

Rinkai Construction Co., Ltd.
Jakarta, Indonesia

Siam-Phil Corporation
Korea

On-Going Projects

Consortium Japonais Pour L' Auto Route Algerienne- Kajima Corporation

• Constantine, Algeria

Consortium Japonais Pour L' Auto Route Algerienne- Kajima-Taisei JV
• Annaba, Algeria

Dai Nippon Construction
• Manpula, Mozambique
• Republic of Mali

Dai Nippon East Timor
• Dili, East Timor

Hitachi Plant Technologies Ltd.
• Singapore

Kajima Corporation
• Oran, Algeria

Kitano Construction
• Yemen

Konoike Construction Ltd.
• Suva, Fiji

P.T. Kajima Indonesia
• Jakarta, Indonesia
Tan san nhat Airport Project
Hanoi Vietnam
 
Cuamba Teacher Training Center
Mozambique, Africa
 
Liquefied petroleum Gas Project
Sakhalin, Russia
 
Kitano Mendana Hotel Project
Solomon Island
 
Chimio School Building Project
Mozambique, Africa
Bridge and Road Project
Camp 2, Constantine, Algeria
 
Bridge and Road Project
Camp 7, Anaba, Algeria
 
Lng, Lpg, Roads and Bridges Projects
Oran, Algeria
 

 